Melbourne Racing Club
Name: Melbourne Racing Club
Client: Kane Constructions
Location: Caulfield
Build time: 2 months
Standstruct was engaged by Kane Constructions to take on the timber structure of Melbourne Racing Club’s new Administration building.
The structure consisted of glulam Post and Beam construction, with CLT floor plates exposed underneath.
This style of construction lends itself to Mass Timber and Standstructs efficient installation methods.
FAST FACTS:
- Construction:
-
- 19235 Screws and connections
- 2395m2 of CLT Panelling
- 94 Masslam Beams
- 52 Masslam Columns
- 83 Individual CLT Panels
- Transportation/Craneage
- 18 Semi loads of Timber
- 90t Slew Crane