Melbourne Racing Club

Name: Melbourne Racing Club 

Client: Kane Constructions 

Location: Caulfield 

Build time: 2 Months

Standstruct was engaged by Kane Constructions to take on the timber structure of Melbourne Racing Club’s new administration building.

The structure consisted of glulam post and beam construction, with CLT floor plates exposed underneath.

This style of construction lends itself to Mass Timber and Standstruct’s efficient installation methods.

FAST FACTS

Construction:

  • 19,235 screws and connections
  • 2,395m² of CLT panelling
  • 94 Masslam beams
  • 52 Masslam columns
  • 83 individual CLT panels

Transportation/Craneage:

  • 18 semi loads of timber
  • 90t slew crane